Answer:
The unit requires a continuous, uninterruptible potable water supply line plumbed to its 1-1/4 inch NB inlet and is anchored to a concrete floor using 4 bolts through its 180 mm base plate on a 150 mm PCD.
Installing the Udyogi 6250 SS requires plumbed industrial utility lines and floor preparation:
- Plumbing Supply Line: Requires connection to a dedicated, continuous potable water line via the 1-1/4 inch NB (BSP) inlet, capable of maintaining the mandatory minimum discharge rates (76 LPM shower, 12 LPM eyewash).
- Drainage Provision: Connects to industrial wastewater or neutralization drains via a standard 1-1/4 inch NB outlet connection to manage flushing runoff.
- Floor Mounting: Anchors onto solid concrete surfaces using 4 anchor bolts through 13 ± 2 mm holes on a 150 ± 2 mm Pitch Circle Diameter (PCD) on the 180 mm base flange, ensuring mechanical stability during emergency pull-rod or foot-pedal activation.