Back to Product
Installation

Installation Guide: Knuffi Corner Protection Type A Plus

Substrate Preparation and Compatibility

Proper surface preparation is mandatory to ensure the high-performance age-resistant modified acrylic adhesive achieves its rated bond strength on structural corners. Knuffi Corner Protection Type A Plus (PA-11010) is engineered for 90-degree right-angle surfaces across diverse industrial substrates, including structural steel, painted industrial sheet metal, sealed concrete, smooth masonry, and finished wood.

Before mounting, thoroughly clean the contact corner using an industrial degreaser or isopropyl alcohol to remove all traces of oil, grease, silicone, dust, and moisture. The substrate must be completely dry, structurally sound, and free of flaking paint or loose debris prior to adhesive contact. Applying profile guards to uncleaned or porous unsealed masonry will significantly reduce adhesive performance.

Thermal Conditions for Application

For optimum initial adhesive tack and contact bonding, install the Type A+ profile within the recommended application temperature range of +10 °C to +20 °C. Once the modified acrylic adhesive has achieved full cure, the assembly withstands continuous operating ambient temperatures ranging from -40 °C to +80 °C, making it suitable for both indoor manufacturing plants and exterior zones such as cold storage facilities, loading bays, and high-moisture processing environments.

Custom Sizing and Trimming

Knuffi Type A+ is supplied in standard 1 m (1000 mm) profile lengths with an outer diameter of 60 mm and a 35 mm x 35 mm 90-degree internal corner cut-out. When custom sizing is required for machinery frames, upright rack columns, or specific wall heights, the flexible high-density polyurethane (PU) foam core and counter-printed outer PU film skin can be cut clean on-site using a heavy-duty utility knife or industrial box cutter.

  • Measure the exact linear corner length required on the column, frame, or passage edge.
  • Mark the cut-line squarely across the yellow and black hatched surface profile.
  • Execute a straight cut through the 60 mm profile using a sharp utility blade against a rigid straightedge in a single smooth pass.

Step-by-Step Mounting Procedure

Follow this systematic procedure to ensure proper mechanical seating and maximum adhesive contact along the entire length of the 90-degree structural corner:

  • Step 1: Alignment Check: Dry-fit the 1 m profile against the target 90-degree right-angle corner to verify that the 35 mm x 35 mm cut-out seats flush against both adjoining perpendicular surfaces without mechanical binding.
  • Step 2: Liner Removal: Peel back approximately 100 mm to 150 mm of the protective backing strip from the modified acrylic adhesive layer at one end of the profile.
  • Step 3: Initial Positioning: Align the exposed adhesive section firmly into the corner apex, seating the internal 90-degree cut-out directly against the corner junction.
  • Step 4: Progressive Bonding: Progressively peel away the remaining adhesive backing liner downward along the 1 m piece while pressing the profile firmly into the corner to eliminate trapped air pockets.
  • Step 5: Final Pressure Application: Apply continuous, uniform hand or roller pressure along the entire length and across both adhesive contact flanks of the 60 mm circular profile.

Adhesive Curing Parameters

The integrated modified acrylic adhesive provides high initial tack, delivering an ultimate peel adhesion rating of 21 N / 25 mm. Optimum bonding strength is achieved after a 24-hour curing cycle at ambient room temperature. Avoid subjecting the newly installed bumper guard to heavy mechanical impact or equipment washdowns during this 24-hour stabilization period.